1. Completed
Mainboard
Mainboard issue. Listed.
Source: IPO Guru Pro
Company information, issue size, price band, lot size, minimum investment, and the dates published for this issue.
Quadrant Future Tek Limited was incorporated in September 2015. It has two businesses. One develops train control and signalling systems for the KAVACH automatic train protection project of Indian Railways. The other makes speciality cables. The cable plant is at Village Basma in Banur tehsil, Mohali district, Punjab. It includes an Electron Beam Irradiation Centre. The cables are sold for railways, naval defence, renewable energy and electric vehicle uses. The company has an exclusive memorandum of understanding with RailTel to pursue KAVACH work. It had 295 employees on 31 October 2024 across the plant, the signalling design centre and corporate functions. The IPO was a fresh issue of Rs 290 crore. Rs 149.72 crore was planned for working capital and Rs 24.38 crore for developing an Electronic Interlocking System.
Current premium in rupees, the derived percentage, and the indicative price. History shows observed readings only. A missing premium is unavailable, not ₹0.
Grey Market Premium (GMP) is an unofficial market indicator and is not published by stock exchanges. Estimated listing values are illustrative, may change, and should not be considered a forecast or investment recommendation.
Subscription is shown in times subscribed. A missing multiple stays unavailable. A published zero is 0x.
Last updated: Unavailable
Last updated: Unavailable
Source: IPO Guru Pro Data by IPO Guru
History retrieved: 10 Nov 2026, 4:00 PM IST
No day-wise subscription history is loaded. Missing days are left blank and are not plotted as zero.
Source: IPO Guru Pro. History retrieved 10 Nov 2026, 4:00 PM IST.
Revenue and profit are in rupees for each reporting period. Assets, liabilities, and ratios use the source unit when the statement includes them. Missing figures stay blank.
| Metric (Rs. Crore) | 30 Sep 2024 | 31 Mar 2024 | 31 Mar 2023 | 31 Mar 2022 |
|---|---|---|---|---|
| Assets | 149.66 | 142.82 | 118.82 | 112.77 |
| Total Income | 65.14 | 151.82 | 152.95 | 104.29 |
| Profit After Tax |
Results may still be pending. Check Allotment opens the registrar allotment portal. You may need to select this IPO there. Sign-in is not required.
This is the actual change from the issue price to the listing price. It is separate from the unofficial GMP estimate. A missing price stays unavailable.
RHP, DRHP, and other links that passed the official address check. Unverified addresses are left out.
Data by IPO Guru · Updated
Quadrant Future Tek develops train control and signalling systems for the KAVACH project of Indian Railways and makes speciality cables. It reported total income of Rs 151.82 crore in FY2024.
Mohit Vohra, Amit Dhawan, Amrit Singh Randhawa, Rupinder Singh, Vishesh Abrol, Vivek Abrol, Aikjot Singh and Rajbir Singh Randhawa
1. Completed
2. Completed
3. Completed
4. Completed
Refund
Demat credit
Indicative only. A GMP-implied price is not a guaranteed listing price.
Unofficial grey-market premium in rupees. Missing observations are not connected and are not drawn as ₹0. This chart is not the listing gain.
High unavailable · Low unavailable
Tap a point for its rupee amount, percentage, and IST time. The table lists the same observations.
Source: IPO Guru Pro. History retrieved 10 Nov 2026, 4:00 PM IST.
| Observed (IST) | GMP (₹) | GMP % | Mark |
|---|---|---|---|
| 13 Jan 2025, 12:00 PM IST | ₹110 | +37.93% | None |
No intraday GMP history is loaded. Missing slots are not filled in.
High unavailable · Low unavailable
Source: IPO Guru Pro. History retrieved 10 Nov 2026, 4:00 PM IST.
| -12.11 |
| 14.71 |
| 13.90 |
| 1.94 |
| NET Worth | 34.18 | 44.11 | 29.42 | 15.61 |
| Reserves and Surplus | 4.18 | 34.11 | 19.42 | 5.61 |
| Total Borrowing | 98.01 | 81.61 | 74.00 | 80.68 |