1. Completed
Mainboard
Mainboard issue. Listed.
Source: IPO Guru Pro
Company information, issue size, price band, lot size, minimum investment, and the dates published for this issue.
Sambhv Steel Tubes Limited was incorporated in 2017. It makes electric resistance welded steel pipes and structural tubes. Its plant is at Sarora in Tilda tehsil near Raipur, Chhattisgarh. The company sources iron ore from a Navratna public sector miner and coal through a Maharatna public sector company. The coal mines are about 250 kilometres from the plant. The distribution network covered 15 states and one union territory on 31 December 2024. It includes Chhattisgarh, Maharashtra, Gujarat, Haryana, Rajasthan and Uttar Pradesh. The IPO was Rs 540 crore, with Rs 440.02 crore of fresh issue and Rs 99.98 crore of offer for sale. Rs 390.00 crore of the fresh money was planned for repaying borrowings.
Current premium in rupees, the derived percentage, and the indicative price. History shows observed readings only. A missing premium is unavailable, not ₹0.
Grey Market Premium (GMP) is an unofficial market indicator and is not published by stock exchanges. Estimated listing values are illustrative, may change, and should not be considered a forecast or investment recommendation.
Subscription is shown in times subscribed. A missing multiple stays unavailable. A published zero is 0x.
Last updated: Unavailable
Last updated: Unavailable
Source: IPO Guru Pro Data by IPO Guru
History retrieved: 10 Nov 2026, 4:15 PM IST
No day-wise subscription history is loaded. Missing days are left blank and are not plotted as zero.
Source: IPO Guru Pro. History retrieved 10 Nov 2026, 4:15 PM IST.
Revenue and profit are in rupees for each reporting period. Assets, liabilities, and ratios use the source unit when the statement includes them. Missing figures stay blank.
| Metric (Rs. Crore) | 31 Dec 2024 | 31 Mar 2024 | 31 Mar 2023 | 31 Mar 2022 |
|---|---|---|---|---|
| Assets | 1,411.82 | 940.13 | 552.14 | 458.51 |
| Total Income | 1,018.81 | 1,289.38 | 939.00 | 820.75 |
| Profit After Tax |
Results may still be pending. Check Allotment opens the registrar allotment portal. You may need to select this IPO there. Sign-in is not required.
This is the actual change from the issue price to the listing price. It is separate from the unofficial GMP estimate. A missing price stays unavailable.
RHP, DRHP, and other links that passed the official address check. Unverified addresses are left out.
Data by IPO Guru · Updated
Sambhv Steel Tubes makes electric resistance welded steel pipes and structural tubes at Tilda near Raipur in Chhattisgarh. Its distribution network covered 15 states and one union territory on 31 December 2024.
Brijlal Goyal, Suresh Kumar Goyal, Vikas Kumar Goyal, Sheetal Goyal, Shashank Goyal and Rohit Goyal
1. Completed
2. Completed
3. Completed
4. Completed
Refund
Demat credit
Indicative only. A GMP-implied price is not a guaranteed listing price.
Unofficial grey-market premium in rupees. Missing observations are not connected and are not drawn as ₹0. This chart is not the listing gain.
High unavailable · Low unavailable
Tap a point for its rupee amount, percentage, and IST time. The table lists the same observations.
Source: IPO Guru Pro. History retrieved 10 Nov 2026, 4:15 PM IST.
| Observed (IST) | GMP (₹) | GMP % | Mark |
|---|---|---|---|
| 01 Jul 2025, 12:00 PM IST | ₹13 | +15.85% | None |
No intraday GMP history is loaded. Missing slots are not filled in.
High unavailable · Low unavailable
Source: IPO Guru Pro. History retrieved 10 Nov 2026, 4:15 PM IST.
| 40.69 |
| 82.44 |
| 60.38 |
| 72.11 |
| EBITDA | 106.37 | 159.87 | 117.30 | 124.52 |
| NET Worth | 478.46 | 438.28 | 210.40 | 149.30 |
| Reserves and Surplus | — | 197.28 | 190.31 | 129.21 |
| Total Borrowing | 619.15 | 346.88 | 282.77 | 241.29 |